Extra £174m earmarked for ‘spiralling’ bill for Lower Thames Crossing
More than £3bn is due to be spent on the proposed road tunnel between Kent and Essex, which is estimated to have higher costs per mile than HS2 Ministers have earmarked more than £170m extra to help build the Lower Thames Crossing road tunnel, fuelling concerns over the “spiralling” costs of one (…)
Site référencé: The Guardian (Asia Pacific)
3701.jpg?width=140&quality=85&auto=format&fit=max&s=8f3dda22afec536b6df5f2475a2f2a88, 3701.jpg?width=460&quality=85&auto=format&fit=max&s=5d5e51e29680b4310a73d5aadae4379e, 3701.jpg?width=700&quality=85&auto=format&fit=max&s=420173297e4f0df4365921c42f834635
The Guardian (Asia Pacific)
‘Wasn’t even good’ : US tourist says she was charged €44 for two ice creams in Rome
8/06/2026
France and Germany abandon joint project to build European fighter jet
8/06/2026
World Cup 2026 : Norway label Scotland ‘unprofessional’, Somali referee denied entry to US : football news – live
8/06/2026
The Guardian view on children and the internet : rolling back big tech’s untrammelled power | Editorial
8/06/2026
The Guardian view on climate equality : a richer life and real public abundance, not just more stuff | Editorial
8/06/2026
Middle East crisis live : Iran and Israel announce halt to hostilities as Trump claims both sides want ‘immediate ceasefire’
8/06/2026